Walls and partitions square profiled log 185hх200 mm.
The volume of timber is 80 m / cub.
S roofs 167 m / sq.
The price without finishing (the first stage) includes the cost of materials and work on the construction of a foundation (screw), walls with beams overlapping, and a temporary roof. In addition to the cost of the turn-key finishing, the cost of materials and works for the installation of windows (plastic with double-glazed windows), doors (wooden paneled), floors (OSB 12mm, two layers of vapor barrier, insulation 150mm, density 35, black floor), finishing ceiling mounting, installation of the roof (vapor barrier 2 layers, heater 150mm., metal 0.45mm). Variants of exterior decoration and interior are presented on page: Finishing work, interiors.
How to save on wall material?
Variants of the wall set:
The price of the wall set:
(leave a request) (Profiled glued square log 200Х185h without delivery)
The cost of construction includes:
Delivery of materials. Materials and tools. Construction and installation works. Inventory and overhead. An accommodation the builders.
Additionally, we offer the following services: Electrical installation. Installation of ventilation systems. Installation of heating equipment. Wiring cold and hot water. Delivery and installation of autonomous treatment facilities (septic tank). Installation of fireplaces and stoves. Drilling and improvement of wells. Landscape design.